Demobilisation of NP459

The NP459 performed various cable repair projects with our equipment spread on deck.

We delivered the 1000t carousel, the gooseneck, 10t Tracktensioner, several cable tracks, a 4.5m MBR chute and we custom made a sliding quadrant and sliding frame. As the NP459 had occupation at another project the barge was demobilised.