PS1

Projects

Spooling operations on board the Pioneering Spirit

We mobilized a 500t carousel equipped with 360t liftable basket, loading tower, cable tracks and underbender onto a PSV in Eemshaven. After arrival of the PSV in Moss (Norway) we took care of spooling of 360t umbilical from shore to vessel.

The complete loaded set was lifted from the PSV onto the mighty Pioneering Spirit of Allseas, using their 5000t board crane. The full commissioned set on deck the PS spooled of the umbilical per 25m to attach it to the pipeline that was layed. After completion of the pipeline project, all equipment was demobilised and transported back to the DOC yard in Vlissingen.